Year Customer Work Description
2002 Representative of Ansaldo Energia in Georgia Preparation of draft tube for inspection at Krami-2 HPP, hydroelectric unit 2
2003 Georgian-British oil company Ninotsminda Overhaul of power transformer
2003 Representative of Ansaldo Energia in Georgia Repair works on hotel at Khrami-2 HPP
2003 Satskhenisi Ltd Capital overhaul of hydroelectric unit 2 at Satskhenisi HPP
2003 Representative of Ansaldo Energia in Georgia Repair works on ANSALDO ENERGIA office at Khrami-2 HPP
2003 JSC Gumati HPPs Cascade Overhaul of hydroelectric unit 5 at Gumati HPP
2003 Engurhesi LLC Repair of spherical valve control systems at Enguri HPP, unit 5
2004 Georgian-British oil company Ninotsminda Overhaul of power transformer
2004 JSC Sakenergoremonti Capital overhaul of accumulator room, bus-bar gallery and МКП-110 circuit breakers at Gumati HPPs Cascade
2004 JSC Khramhesi-2 Capital repair of reservoir, water intake gate, generator circuit breakers at Khrami-2 HPP; replacement of accumulator battery and installation of a new one
2004 Ortachalenergy Ltd Installation and alignment of compressor station
2004 JSC Sakgvirabsheni Capital overhaul of hydroelectric generating unit 2 at Kazbegi HPP; repair of electrical part of hydroelectric station; procurement and installation of a new excitation system
2005 Ortachalenergy Ltd Unit 2 repair at Ortachala HPP
2005 JSC Gumati HPPs Cascade 110 kV, 31.5 MVA transformer maintenance at Gumati HPP
2005 CJSC Elittechnostroy Repair of T-3 and T-4 power transformers with 220 kV, 180 MVA and 220 MVA capacities at Tbilsresi, units 3 and 4 (Gardabani Thermal Power Station)
2005 CJSC Elittechnostroy Running repair of T-23 and T-24 transformers with 110kV and 30 MVA capacity at Tbilsresi, units 3 and 4
2005 CJSC Elittechnostroy Capital overhaul of two BBH-220 blast air circuit breakers at Tbilsresi, units 3 and 4
2005 DSD NOELL GmbH and          JSC Sakhydroenergomsheni Assembly of stoplog and its hoisting system at Enguri arch dam
2005 Engurhesi LLC Emergency repair of service valve at Enguri arch dam, section 18
2005-2006 SESG Corporatsia Ltd Installation and adjustment of LTB SF6 gas switches, five units with 220 kV and four units with 110 kV
2006 JSC Chitakhevi-Borjomi Overhaul of hydro generator No.3 at Chitakhevi
2006 SESG Corporatsia Ltd Rehabilitation of units 3 and 4 and fire-fighting system for transformers No.3 and No.4
2006-2007 Engurhesi LLC Capital overhaul of spherical valve of hydroelectric unit 2
2006-2007 Rionhesi Ltd Capital repair of hydroelectric unit 4
2006-2007 Engurhesi LLC Purchase, delivery and installation of disk valve oil-pressure system
2006-2007 Engurhesi LLC Repair of service valve at Enguri arch dam, section 17
2006-2007 Engurhesi LLC Valve setting and assembly at Enguri arch dam, section 17; rehabilitation of valve body
2007 JSC Georgian Manganez Rehabilitation works on 11500 kVA furnace  transformer
2007 JSC Georgian Manganez Capital overhaul of bridge crane, workshop N5
2007 JSC Energo-Pro Georgia 110 kV and 6.3 MVA transformer rehabilitation at Kushi substation
2007 JSC Kavkazelectrokselmsheni 220 kV cells reconstruction with installing SFgas switches at Khashuri-220 and Gori-220 substations
2007-2008 Engurhesi LLC Design, procurement, installation and adjustment of disk valve control and monitoring systems
2008 JSC Zahesi Design, procurement, assembly, adjustment and commissioning of thyristor excitation system of hydroelectric unit 5
2008 Engurhesi LLC Reconstruction of disk valve and its body of section 18 at Enguri arch dam
2008 JSC Zahesi Capital repair of МКП-110 oil switches of transformers No.5 and N6 and power line Avchala-110 at Zemo Avchala HPP
2008 JSC Zahesi Capital repair of T-6 power transformer at Zemo Avchala HPP
2008 Engurhesi LLC Capital overhaul of disk valve servomotors
2008 Mtkvari Energetika Ltd Preventive maintenance of starting, operational and standby systems of excitation at Tbilsresi (Gardabani Thermal Power Station), unit 9
2008 JSC Zahesi Capital repair of hydroelectric unit 6
2008 Engurhesi LLC Maintenance of spherical valve, hydroelectric unit 4
2008 JSC Energo-Pro Georgia Reconstruction and assembly of rotor poles at Gumati HPP, hydroelectric unit 3
2008 JSC Chitakhevi-Borjomi Rehabilitation works on hydroelectric unit 3 at Chitakhevi HPP: replacement of stator winding and full replacement of turn-to-turn and corpus insulation of rotor poles
2008 JSC Georgian State ElectroSystem Capital overhaul of transformer No.1 at Gurjaani-220 substation
2009 Engurhesi LLC Rehabilitation works on emergency and operational gates and their bodies at Enguri arch dam, section 18
2009 Mtkvari Energetika Ltd Diagnostics of high voltage power lines of 500 kV, unit 9 and unit 10
2009 Engurhesi LLC Capital overhaul of gate No.1 of water intake and its hoisting system at Enguri HPP
2009 JSC Chitakhevi-Borjomi Rehabilitation of transformer No.1 at Chitakhevi HPP
2009 JSC Zahesi Design, manufacture, installation, adjustment and commissioning of thyristor excitation system, hydroelectric unit 6 at Zemo Avchala HPP
2009 Engurhesi LLC Reconstruction and repair of emergency and operational gates at Enguri arch dam, section 19
2009 Mtkvari Energetika Ltd Repair and adjustment of standby excitation system of unit 9
2009 JSC Tbilsresi Rehabilitation of 6/0,4 kV transformer, unit 4 Tbilsresi (Gardabani Thermal Power Station)
2010 Engurhesi LLC Installation of new duplicate gate, reconstruction of its body; repair-and-renewal operations at Enguri arch dam, section 16
2010 Engurhesi LLC Production of sealing assemblies of spillway culvert gate at Enguri arch dam
2010 JSC Telasi Capital repair of 20 000/110 power transformer N2 at Zghvispireti substation
2010 JSC Telasi Capital repair of 20 000/110 power transformer No.1 at Gighomi substation
2010 Engurhesi LLC Repair-and-renewal operations on service gate and its body at Enguri arch dam, section 16
2010 JSC Tbilisi Tboelectrocentral Maintenance of 4 000/35 power transformer No.2 at Tbilisi Tboelectrocentral
2011 Engurhesi LLC Repair of spindle and cover of 260MW hydro-turbine
2011 JSC Energo-Pro Georgia Repair of rotor poles of hydroelectric unit with full replacement of insulation at Rioni HPP and Kinkisha HPP
2011 Engurhesi LLC Repair of service and repair gates and their bodies at Enguri arch dam, section 17
2011 Engurhesi LLC Maintenance of emergency repair plane gate No.2 and its water intake at Enguri HPP
2012 Engurhesi LLC Setup of new system of bypassing and air escape of repair gates of spillway culvert, Enguri arch dam
2012 Engurhesi LLC Hermetic sealing of spillway culvert, section 15
2012 Engurhesi LLC Additional repair of No.1 spherical valve
2012 Engurhesi LLC Repair of hydrotechnical equipment for head structure at Sokhumi HPP
2012 Engurhesi LLC Second stage of repair works on Sokhumi HPP head structure
2013 Engurhesi LLC Repair of unit No.4 draft tube hermetic door, Enguri HPP
2013 Engurhesi LLC Repair of emergency and operational gates and their bodies of spillway culvert; replacement of sealing elements, section 19 of Enguri arch dam
2013 JSC Energo-Pro Georgia Replacement of body and turn-to-turn insulation of rotor poles at Martkopi HPP
2013 Engurhesi LLC Manufacture and delivery of sealing and fastening elements of spillway culvert gates, Enguri arch dam
2013 Engurhesi LLC Capital repair of No.5 spherical valve
2013-2014 Kano LLC Rehabilitation of hydrotechnical equipment of head structure at Vardnili HPP
2014 Engurhesi LLC Purchase of polyethylene sealing elements and their fastening parts of service and emergency repair gates of spillway culvert
2014 Engurhesi LLC Repair of spillway culvert operational gate and its frame; replacement of sealing elements, section 16
2014 Engurhesi LLC Emergency repair works on unit No.1 of Enguri HPP
2015 Feljas & Masson Installation of metal structure for storage of bars, Vardnili HPP-1
2015 Engurhesi LLC Manufacture and delivery of sealing joints of spillway culvert gates at Enguri arch dam
2016 Engurhesi Ltd. Reconstruction and repair of service gate valve and its body, replacement of sealing elements, section 17 of spillway culvert at Enguri arch dam
2016 JSC Georgian State

Electrosystem

Delivery of 10kV neutral of earthing resistor NER 200A/10,5kV/KB10s
2016 Vardnili HPP Cascade Ltd. Repair of service gate of idler spillway culvert at Vardnili HPP-1
2017 Engurhesi LLC Repair of service gate and its body, manufacture and replacement of sealing elements, sections 16 and 18 of spillway culvert at Enguri arch dam
2017 Engurhesi LLC Reconstruction of damaged sections of 5m upstream pipeline, hydroelectric unit 1 at Enguri HPP
2017 VAPTECH Installation of 1800mm disk valve and its operating and control system
2017 Engurhesi LLC Installation works on high accuracy water discharge measurement system in penstock No.5 at Enguri HPP
2017 Engurhesi LLC Repair of service gate and its frame of section 19 of spillway culverts at Enguri arch dam; replacement of their sealing elements
2017 Engurhesi LLC Reconstuction of damaged sections of penstock, hydroelectric unit No.5
2018 Engurhesi LLC Reconstruction of damaged sections of 5m upstream pipeline, hydroelectric unit No.5 at Enguri HPP
2018 Vardnili HPP Cascade Ltd. Design, manufacture and installation of device for transferring 17,5 t  service gate of head structure from its stationary suspension place to repair site, Vardnili HPP-1
2018 Engurhesi LLC Reconstuction of damaged sections of penstock, hydroelectric unit No.2
2018 Vardnili HPP Cascade Ltd. Repair of service gate of Vardnili HPP spillway culvert
2018 Engurhesi LLC Repair of service gate and its frame of sections 17 and 18 of spillway culverts at Enguri arch dam; replacement of their sealing elements
2019 Engurhesi LLC Installation works of high accuracy water discharge measurement system in penstock No.5
2019 Vardnili HPP Cascade Ltd. Design, manufacture and installation of devices for transferring service gates of hydroelectric units No.1 and No.2 of head structure from their stationary suspension places to repair site, Vardnili HPP-1